Digging the footings for cabin #9

Wednesday morning before 8:00, Wade & Greg arrived to start digging the footings for cabin #9.

digging footings

Starting to dig the footings for cabin #9

loading truck

Greg watches as Wade digs and loads the truck with dirt

Cabin #10

Cabin #10 wathes as Wade digs the footings!

Digging the footings in an existing cabin is a little more work than starting from scratch. There are water, electric, propane and sewer lines below and around the cabin that all need to be watched and gently moved during the digging. Oh yes, there are tree roots too!

Digging tree roots

Bob helping dig tree roots for cabin #9 foundation

Footings dug

4:10 – All finished!